ŞEN GLOBAL LOJİSTİK

Depolama Hizmetleri

Priz Tesisatı Ve Kablo Çekme Işleri

Sockets are tools that allow electrical devices to be energised from an electrical circuit via a plug. The procedures to be performed when pulling the socket installation cables are as follows. During rough construction, the piping between the liner junction box and the floor panel is made before the concrete is poured. Before the walls of the building are finalised, the down pipes between the liner junction box and the socket box are laid horizontally or vertically. Then socket boxes are mounted on the ends of the pipes. The liner line from the floor panel to the liner junction box is drawn as an independent line with the help of susta and guide. It is ensured that earth and neutral connections are not used in common. Then the socket socket is pulled with the help of socket and guide by using the sorti descents made under the plaster from the liner junction box. Socket liner and sorti cables are connected with terminal blocks or sleeves to be compatible with each other. W automat connection is made from the main panel to each socket socket on the socket lining. The socket sorting is completed by connecting the relevant socket to the cables in the socket box.